Since the establishment of 2001, Changzhou Wujin Shengyue Mould Plastic Co., Ltd has won the customers' favor depending on reliable reputation, advantageous prices, high quality, high efficiency and perfect service. At the same time our company also develops rapidly. In cooperation with domestic and foreign enterprises, we are growing our own strength, now we have become a professional plastic parts supplier.
As a professional supplier of plastic parts, our company covers an area of 10,000 square meters. Now we have 30 injection machines, from 80T to 400T, and 8 extrusion lines. We have 180 staff including nearly 30 engineering technicians.
We also have our own mold making workshop and can supply mold & samples according to customer's requests. Our mold team is very professional, and well- managed. The QC department has a strict testing system with various types of precise testing equipments. Our team can response to customer’s demands quickly and professionally.
Back to Chinese Yangtze Delta mold city, we have unique advantages in the supply chain of the molds. Adhering the concept of service for all customers, we continuously strengthen cooperation with customers, providing a full range of service to our customers.
2001: The company was established in Hutang Wujin Changzhou. The basic business including injection molding and plastic tooling.
2005: Our company carried out plastic extrusion business formally.
2007: On the basis of bakelite production, our company brought in the BMC molding production line, it became one of the company's characteristics.
2008: We moved to Wujin high-tech zone.
2009: Our company passed ISO9001 quality system.
2014: Our company introduced the most advanced air-assisted injection molding technology and equipment.
Take the customers' demand as the core valve-persistent innovation
Rely on technology innovation-continue to climb
Base on the production capability-constantly breakthrough
Shengyue Service Procedure
Inquiry: Early Supplier Involvement
• Material selection
• Molding technology solutions
• Help source suitable supplier for non-plastic parts
Quotation
• Transparent quotation sheet
• Quick response
• Differential pricing
Tooling Production
• Tooling drawing and design
• DFM report
• Mold flow analysis
• Tooling schedule for process control
Sample Presentation: FAI report
• Material properties & material certificate
• Molding process and parameters
• Inspection data for each cavity
Part Production
• SOP/ working instruction & inspection guidelines
• ISO 9001:2008 certificate
Delivery
• Outgoing inspection report
• Professional freight partner
• The US warehouse in the plan
We have about 180 employees, 30 engineering technicians included and own a tooling making workshop with the professional design team and well-managed mold team.
Tooling Design Department
Offices
Meeting Room